Riello Two stage operation forced draught natural gas/propane burner Service Manual

Browse online or download Service Manual for Fireplaces Riello Two stage operation forced draught natural gas/propane burner. Riello Two stage operation forced draught natural gas/propane burner Technical data User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 22
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Installation, use and maintenance instructions
Instrucciones de Instalación, Funcionamiento y Mantenimiento
Instruções de Instalação, Funcionamento e Manutenção
Forced draught gas burners
Quemadores de gas
Queimadores a gás
2915932 (0)
CODE - CÓDIGO MODEL - MODELO TYPE - TIPO
3783302 RS 28 809 T1
3783303 RS 28 809 T1
3784402 RS 38 810 T1
3784403 RS 38 810 T1
3784502 RS 38 810 T1
3784503 RS 38 810 T1
3784702 RS 50 811 T1
3784703 RS 50 811 T1
GB
E
P
Progressive two-stage operation
Funcionamiento a dos llamas progresivas
Funcionamento a duas chamas progressivas
Page view 0
1 2 3 4 5 6 ... 21 22

Summary of Contents

Page 1 - Queimadores a gás

Installation, use and maintenance instructionsInstrucciones de Instalación, Funcionamiento y MantenimientoInstruções de Instalação, Funcionamento e M

Page 2 - CONTENTS

9ELECTRICAL SYSTEMELECTRICAL SYSTEM as set up by the manu-facturerLAYOUT (A)Burner RS 28 (single-phase)LAYOUT (B)Burner RS 38 (single-phase)LAYOUT (C)

Page 3

10ELECTRICAL CONNECTIONSUse flexible cables according to EN 60 335-1Regulations:• if in PVC sheath, use at least H05 VV-F• if in rubber sheath, use at

Page 4

11LAYOUT (A) - The RS 38 - 50 Models electrical connection three-phase power supply with-out leak detection control deviceLAYOUT (B) - The RS 38 - 50

Page 5

12ADJUSTMENTS BEFORE FIRST FIRINGAdjustment of the combustion head, and air andgas deliveries has been illustrated on page 7.In addition, the followin

Page 6

13BURNER CALIBRATIONThe optimum calibration of the burner requiresan analysis of the flue gases at the boiler outlet.Adjust successively:1 - First firin

Page 7

14Adjusting air deliveryProgressively adjust the end profile of cam 4)(A)by turning the cam adjustment screws as theyappear through the access opening

Page 8

155 - AIR PRESSURE SWITCH (A)Adjust the air pressure switch after having per-formed all other burner adjustments with the airpressure switch set to th

Page 9 - 1/4 − 3970144 • • • 3010123 −

16BURNER OPERATIONBURNER STARTING (A)• : Control device TL closes.Servomotor starts: it rotates duringopening up to the angle set on camSt1.After abou

Page 10 - ELECTRICAL SYSTEM

17FINAL CHECKS (with burner running)• Disconnect one of the wires on the minimumgas pressure switch:• Open remote control device TL:• Open remote cont

Page 11

18BURNER START-UP CYCLE DIAGNOSTICSDuring start-up, indication is according to the followin table: RESETTING THE CONTROL BOX AND USING DIAGNOSTICSThe

Page 12

1 CONTENTS TECHNICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 2 Variants . . . . . . . . . . . . . . . . . . . . .

Page 13

19SIGNAL FAULT PROBABLE CAUSE SUGGESTED REMEDY2 x blinks After pre-purge and safety time, the burner goes tolock-out and the flame does not appear1 -

Page 14

20STATUSAccessory available on request. See page 2.ASSEMBLYThe burners are preset to accept the Status. Toassemble, proceed as follows:- Connect Statu

Page 15

RIELLO S.p.A.Via degli Alpini 1I - 37045 Legnago (VR)Tel.: +39.0442.630111 Fax: +39.0442.630375http:// www.rielloburners.comSubject to modifications -

Page 16

2 TECHNICAL DATA (1) Reference conditions: Ambient temperature 20°C - Barometric pressure 1000 mbar - Altitude 100 m a.s.l.(2) Pressure at test point

Page 17 - NO FIRING

3 BURNER DESCRIPTION (A) 1 Combustion head2 Ignition electrode3 Screw for combustion head adjustment4 Sleeve5 Minimum air pressure switch (differenti

Page 18 - MAINTENANCE

4 FIRING RATES (A) The RS 28-38-50 burners can work in two ways:one-stage and two-stage MAXIMUM OUTPUT must be selected in area A. MINIMUM OUTPUT m

Page 19

5 GAS PRESSURE The adjacent tables show minimum pressurelosses along the gas supply line depending onthe burner output in 2nd stage operation.Column

Page 20

6 INSTALLATION BOILER PLATE (A) Drill the combustion chamber locking plate asshown in (A). The position of the threaded holes can bemarked using the

Page 21 - STATUS (optional)

7 SETTING THE COMBUSTION HEAD Installation operations are now at the stagewhere the blast tube and sleeve are secured tothe boiler as shown in fig.(A)

Page 22

8 GAS LINE • The gas train must be connected to the gasattachment 1)(A), using flange 2), gasket 3)and screws 4) supplied with the burner.• The gas tr

Comments to this Manuals

No comments